Atur jumlah dan catatan
Stok Total: 99
Subtotal
Rp1.793.000
Wholesale 50pcs long lead New Silver MICA Capacitors 500pF 500V for tube audio guitar amps tone DIY parts free shipping
Rp1.793.000
- Kondisi: Baru
- Min. Pemesanan: 1 Buah
- Etalase: Semua Etalase
Wholesale 50pcs long lead New Silver MICA Capacitors 500pF 500V for tube audio guitar amps tone DIY parts free shipping 32707414468 Pre-Order +/- Sampai Alamat 10-15 Hari FREE ONGKIR+PAJAK Garansi uang kembali jika Rusak, Beda Produk Synchronous Rectification Technology : No Sub-control Switch : No Master Switch : No Support Quick Charge : No USB Total Power : NONE Single USB Max Output : None USB Ports Number : None Rated Power : NONE Application : Residential / General-Purpose Rated Current : NONE Rated Voltage : 110-250V Model Number : 50xMICA500pf Extension Cable Length : None WIFI : No Surge Protector : No Overload Protection : No Outlets Number : 1 Grounding : Non-Grounding Type : tube sockets Brand Name : Cayyi Place of Origin : Guangdong, China (Mainland) Specifics: Model: 500V 500pf 5% All in New condition never be used. Silver mica capacitors were commonly used in vintage tube amplifiers. They are great performers in tone and presence controls because of their stability and low loss. Silver mica capacitors are available in much smaller values than poly capacitors like Mallory 150Ms and Sprague Orange Drops, and are commonly found in tone critical circuits because of their high performance, low signal loss, and superior tone. Silver Mica capacitors are a highquality capacitor. They are especially popular for usein R.F circuits. One of the main features of silvermica capacitors is their stability. They also have a low tolerance(meaningthey are very accurate). Package includes: 1x 50pcs New Silver MICA Capacitors 500pF 500V for guitar amps tone tube audio We stand behind every product we sell. If you #39;re not pleased with your purchase, we #39;ll be happy to make an exchange or refund the product price less S amp;H within 30 days of your purchase. For any exchange or refund, we need the original receip
Ada masalah dengan produk ini?
ULASAN PEMBELI

Belum ada ulasan untuk produk ini
Beli produk ini dan jadilah yang pertama memberikan ulasan